Steel Frame Erection, Bridge Construction

Efficient Construction Solutions Through Extensive Experience and Technical Expertise.


Transport is an essential part of every crane operation. At SAWADA Corporation, we specialize in the safe, efficient, and reliable transportation of heavy and oversized loads, including those for plant facility construction and bridge erection projects. With a diverse fleet of trailers, trucks, and unic cranes, we can transport construction materials such as steel, precast concrete (PC), bridge girders, and large machinery, adapting to the unique requirements of each job site. Our comprehensive transport solutions ensure seamless operations and enhanced project efficiency.
Construction Achievements
Showcasing Our Proven Track Record Built Over the Years.
-
JR West Japan – Sanin Line – Yobe Bridge
Construction Period: December 18, 2009
-
R175 Miki
Construction Period: November 16, 2009
-
Port Island New Traffic
Construction Period: January 14, 2004
-
Hanshin Expressway No.3 Kobe Line Minatogawa JC
Construction Period: March 12, 2010
-
Hanshin Expressway No.5 Wangan Line, Fukae-hama
Construction Period: August 8, 2002
-
Izushi
Construction Period: May 15, 2008